Yes. A custom project can begin from a 2D drawing, a 3D drawing, a physical sample, or a market reference item. However, the factory still needs enough technical information to evaluate geometry, tolerance, lid logic, and production feasibility before tooling is confirmed.
The timeline depends on design quality, revision cycles, tooling route, and approval speed. In many practical projects, requirement confirmation and design review take several days, prototype tooling and first samples take around one to two weeks, and production tooling may take a further two to three weeks once the structure is frozen.